150 KV Gas Insulated Substation, Velsen

150 KV Gas Insulated Substation, Velsen

PROJECTS 150 KV Gas Insulated Substation, Velsen Engineering and drawing work for the secondary installation for 2 fields of the new 150 kV GIS installation.These two fields connect the new 150 kV GIS installation with the existing 150 kV ABB installation Primary...
Draw-Bridge Remote Control Center

Draw-Bridge Remote Control Center

PROJECTS Draw-Bridge Remote Control Center Creating PLC and scada system panels for operation of bridges at North Holland. Project Details Project 24 Uurs Centrale Bediening Bruggen En Sluizen Volume ...